Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/us.gradconcept.com/public_html/wp-content/themes/renovation-company/_assets/_php/sections.php on line 1072

Grad® for decking & rooftop

Up to 50% faster installation

Grad® for cladding & ceiling

No individual clips to screw

Grad® for Docks & Marine Construction

30-year Warranty

Grad® for cladding & ceiling

Works with 20+ surface materials

The clip-on fixing solution with 100% hidden fasteners and a 30-year warranty for all your building projects!

Our current partners in North America

    Bamboo / Holland / Contractor: Awood

    Grad® for cladding & ceiling invisible Grad Clip

    • direct application onto walls
    • or over insulation panels with brackets
    • perfect rainscreen or decorative cladding

    Rails + Pedestals for Rooftop

    Grad® for decking & rooftop invisible Grad Clip

    • use over joists or straight onto hard surfaces
    • use with pedestals or not
    • over 20 types of surface materials allowed

    Product HighlightsUnique features

    Grad® chooses quality products with unique technical solutions for an optimal, comfortable and lasting result!

    • 100% hidden fastening system for the smoothest surface
    • Effortless installation: just snap the surface material onto the clips
    • No individual clip to screw: save on installation time and labour costs
    • Remove, update, replace boards and pavers at will
    • Best for green building projects
    • 30-year Warranty to gain your trust

    What do they say about Grad®Client's voice...

    The system is reliable and a powerful method that is quick to use and simple to understand. It is strong and makes building decks easy with a perfect finish. There are no screws, the equipment is snapped together and there are solutions for every situation.

    Uri Shaham, professional contractor and decking specialist in Israel

    Worked on a 1600ft² renovation project with Grad®:
    - removal of old decking + disposal: 32 hours
    - ground preparation + Grad for decking installation + Moso® boards: 96 hours

    Grad® Concept is a proud member of

      Grad ConceptAlready have a project?

      Call our specialist and discover the Grad network.

      Visit us on linkedinGrad Concept US

      We are on twitterGrad Twitter US

      Check our Pinterest profileGrad Pinterest US